Remodel Sequence
Tick what you plan to change, and see the order the work usually follows, from the plan to the final walkthrough.

In what order does a remodel happen?
Saved. It will travel with the request form below.
The usual order of work. Your own schedule is written down after the design is set, and inspections can add steps.
Three steps
Tick everything you plan to change in the bathroom.
Read the steps in the order they usually happen.
Save the list to send with your request.
Bathroom work follows an order for good reasons: pipes before walls, waterproofing before tile and glass last. Knowing the order helps you plan your days and your decisions.
About this tool
Does the order ever change?
A little, depending on the project and the inspections your city requires. A written schedule for your job comes after the design.
Does it show how long each step takes?
No. Time depends on size, materials, permits and choices, and we write the schedule down after the design is set.
Does it replace a site walk?
No. It is a planning aid. A site walk checks the room, the plumbing, access and local codes.
Services that use these numbers

Electrical and GFCI Upgrades
A safe bathroom needs the right outlets, switches and circuits. We upgrade the electrical so lights, fans and heated features run as they should.

Full Bathroom Remodeling
A full bathroom remodel takes the room down to the studs and builds it back the way you want, with a new layout, new surfaces and new fixtures.

Bathroom Permits and Inspections
Many bathroom projects need permits and inspections. We help you understand what your city requires and handle the paperwork with you.
Ready to see your new bathroom?
Tell us about the room you have and the one you want. We will walk the space, talk through the options in plain words and show you the design in 3D before anything is built.